In forceWater & Sanitation
Approved Document H: Drainage and waste disposal
Foul water, surface water and solid waste
Guidance on drainage systems, foul and surface water disposal, rainwater harvesting and solid waste storage.
Also known as: AD H, Approved Document H, drainage
Key requirements
- Covers foul drainage, surface water drainage and connections to sewers.
- Includes guidance on rainwater and greywater harvesting.
- Addresses solid waste storage and access for collection.
- Requires adequate capacity, gradients, ventilation and access for maintenance.
Performance at a glance
- Scope
- Foul + surface water
- Waste
- Solid waste storage
Applies to
New buildings and drainage work in England.
Related records
Reviewed 25 October 2026. This summary is an editorial reference, not legal advice. Check the current official text and confirm the approach with building control before relying on it. Browse all 35 records.