In forceServices & Security
Approved Document R: Infrastructure for electronic communications
Gigabit-ready connectivity
Requires new buildings to be provided with infrastructure for high-speed electronic communications networks.
Also known as: AD R, Approved Document R, gigabit, broadband
Key requirements
- Covers in-building physical infrastructure for gigabit-capable connections.
- Requires suitable access points and connection points.
- Applies to new buildings, including dwellings and non-domestic buildings.
- Works alongside the telecommunications industry's installation standards.
Performance at a glance
- Target
- Gigabit-capable infrastructure
- Scope
- New buildings
Applies to
New buildings in England.
Related records
Reviewed 25 October 2026. This summary is an editorial reference, not legal advice. Check the current official text and confirm the approach with building control before relying on it. Browse all 35 records.